Introduction

The current status of public review drafts for the Dedicated Security Components iTC can be seen on this page.

Note

This is supposed to just list the current status. Each document is likely to need its own page because they are likely to run at different steps. Either way, a table showing the documents and their status should just be listed. If there isn’t anything, then a blank table with a note that nothing is currently under review is sufficient.

The document(s) will follow the Public Review Process as specified at Dedicated Security Components Public Review Process.

Please email iTC-DSC@niap-ccevs.org if there are any questions about the Review process.

Review Status Phase

The document(s) listed here are in the Public Review Draft 1 phase.

Publication Date

<start date>

End of Comment Period

<end date>

Documents for Review

The following are the documents included in this Public Review Draft 1 Period:

Table 1. Review Documents
Title Version Link Review Phase

collaborative PP for Dedicated Security Components feature

0.8

Download cPP

Public Review Draft 2

PP-Configuration for base-cPP and PP-Modules

0.1

Download PP-Configuration

Internal Draft

Supporting Document Mandatory Technical Document: Evaluation Activities for collaborative PP-Module for Mobile biometric enrolment and verification - for unlocking the device -

0.3

Download Supporting Document

Public Review Draft 1 Update

Document Release Process

Based on the Public Review Process document, the documents listed here are currently in the highlighted phase below.

I have been using yellow (with cYEL) in the box that is the current phase. Other ditaa colors could be used. This could be removed completely for just note about the phase.

Important

If you are making any adjustments to the Review Process from what is documented in your primary document, these should be called out here to be clear. They should have a separate heading to be clear.

Overall Status